A new city hall for Haarlemmermeer
For the city hall Haarlemmermeer, RAU designed a new landmark in the centre of Hoofddorp. The building would be alive: hornbeam grows on its facade, while a fully timber structure carries it from inside. The design was RAU’s entry for the competition, in which it finished runner-up.
The design draws on the history of Haarlemmermeer, a lake drained to become farmland. In addition, it aims to help a new biobased industry grow in the region, in line with a future-proof vision for Haarlemmermeer.
A new square and meeting point
Hoofddorp sits within the patchwork of the Haarlemmermeer polder. The city hall stands as the central object on Raadhuisplein. Its polygonal footprint guides people from the station to the shopping area. As a result, a new square and meeting point forms on the south side.
The landscape continues into the ground floor. A large public space runs through the building from north to south, open to everyone.


A transparent city hall
The public spaces sit just above ground level: the council chamber, the citizens’ hall and the wedding hall. A tall, transparent plinth looks out over voids spanning several floors. In this way, the public character of the building is visible from the street.
The upper floors hold offices, where staff from several municipal departments work together. Individual workplaces line the facade, so every desk gets daylight and space. Meeting rooms, by contrast, are clustered in the centre of each floor, within easy reach. Moreover, the warm timber interior invites collaboration, and every desk looks out onto greenery.
Material depot
The building was designed to be fully demountable, energy-neutral and CO?-positive. Its materials would remain identifiable and reusable, so the city hall acts as a material depot for future generations.









